Home | Prototype Detail

19th March

1st March


24th February
Throttle Servo Fitted. Tank mounting platform and strap fitted
Sceadu EVO head fitted.

13th February

A quick look at the donor machine, the KNIGHT 50.

Knight 50 Mechanics. Stacked frames.
Picture angle isn't perfect, but you get the idea. Lowered Boom and Swash.

11th February

Got to the stage were you do lots of work, but the heli just looks the same, no major visual changes. Had a play with a crashed Knight 50 Canopy, see how it can be modified abit, to make it look abit more streamlined !!

6th February

Mainshafts abit long !!! Using a Sceadu shaft ATM, due to the bearing block below the maingear assembly. In total the shaft needs shortening by 32 mm. That's the next bit to get made.



5th February

Starting to look like a heli now !! CCPM front servos have been moved inside the frames. Tail Servo Bellcrank and Pushrod Fitted. Elevator A-Arm reduced in length too.

Right Side
Left Side


4th February

Frames have been apart, to allow for a few tweaks!! Back together with servos installed. Front servos mounted outside frames ATM. Will be moving them inside to reduce the spacing required between the frames and the bellcranks.

Left Side
Right Side
Rear View - Elevator Servo


1st February

Engine (Modified JR Voyager 50 Engine Mount Used), Tail Servo and Bellcrank installed.
Frontal View - Showing the Vertical Radio Tray.
Rear View - Elevator Bellcrank dummy install and the Tank Plate Mount.


29th January - RIGHT FIRST TIME ???

Early days, at least the bearing block fits !!
Looking GOOD Already !
Skids on, still looking GOOD !


28th January - Lets CUT Some Frames:

It was a long night, but Chris just kept smiling, "It'll be right next time !!" I keep saying.
First Main Frame off the Production Line !!!
Stella Job !!!!
First Prototype Frames, Frame Braces, Tank and Radio Plate !! Cheers Chris, But will it fit together !!